Eric Notes

Engineering notes · Published on LinkedIn

“When he built the third village, the craftsman trusted the scroll.”

Once there was a craftsman who knew the roads well. He crossed mountains and seas, extending his reach one village at a time. Building the first village was chaotic. By the second he was getting the hang of it. He began writing things down on a scroll.

Original LinkedIn cover

“When he built the third village, the craftsman trusted the scroll.”

Once there was a craftsman who knew the roads well. He crossed mountains and seas, extending his reach one village at a time. Building the first village was chaotic. By the second he was getting the hang of it. He began writing things down on a scroll.

“Build houses like this. Dig the well about here. Put up the storehouse first.”

With each new village the scroll grew thicker. People called it the scroll that was never wrong. Starting the third village, he unrolled it without hesitation. He filled the gaps from memory and thought anyone could take it from here. Yet the village took longer than expected to build.

All the materials existed, but the timber took time to come down from the mountain. Permissions came through slowly. People knew about those waits. Nobody had written them down. The scroll said what to do, but never when it would be finished.

That night he opened the scroll again. At the top he wrote, “How long does this actually take?”

I wish that were just a story. It’s what happened to me. Expanding into a new region, I’d made checklists and runbooks that I hoped even a new hire could follow. I left out the most practical factor of all: the lead time of our own internal procedures.

Here’s how I see it now. Expansion is a systems problem. A checklist earns its keep by how honestly it accounts for time, beyond the number of entries on it. So I’m rewriting the scroll.

Original LinkedIn post

All essays